Built for Irish self-builders

Don't miss a step
on your build —
or pay for it later

PlotPacer tells you exactly what to do next, what proof you need, and when it matters — so you don't lose money, miss an inspection, or hold up your stage payments.

14-day free trial  ·  No card needed  ·  Cancel anytime

plotpacer.ie/dashboard
Structure phase
42%Complete
31Tasks done
3Overdue
Current tasks
Blockwork completeDone
Order roof trussesOverdue
⚠ Engineer inspectionHold point
Install roof felt + ridgeNext
42% complete74 tasks total
Stage 2 Drawdown
Almost ready
2 items outstanding before you can request
Roof structure certified
Certifier cert pending
Solicitor to confirm
74
Steps mapped to Irish compliance
€0
No card needed to start
BOI & AIB
Lender requirements built in
14-day
Free trial — no card needed

The real cost of getting it wrong

Most builds go over budget.
Not because of prices —
because of avoidable mistakes.

Notes, WhatsApp photos, and scattered documents. That's how most Irish self-builders manage a €300,000+ project. Here's what goes wrong.

🔍

Get the order wrong and you pay to do it twice

Skip the engineer sign-off before pouring concrete and you're breaking open foundations at your own cost. By the time you realise, it's already done.

📄

When the bank calls, you don't have what they need

The BER cert, RECI report, airtightness photos — needed now. They're scattered across email, your phone, and a USB you haven't seen in weeks.

One sequencing mistake can cost more than a year's subscription

Screed before pressure-testing the underfloor heating. Walls closed before first-fix electrical. These mistakes don't announce themselves — until it's too late to fix cheaply.

💸

Drawdown delayed means bridging interest — every week

You think you're ready. The bank needs evidence you haven't got organised. Each week of delay on a typical drawdown costs hundreds in interest you'll never get back.

"Most people realise they're missing something when it's already too late to fix it cheaply."

15–20%
It's common for Irish self-builds to run 15–20% over budget. Most of that isn't materials going up — it's avoidable mistakes, rework, and delays that compound over 18 months. PlotPacer is built to prevent exactly that.

What PlotPacer replaces

You already have a system.
It just doesn't work.

Most self-builders manage a major project with tools built for something else entirely. PlotPacer brings it all into one place.

Without PlotPacer
💬WhatsApp photos no one can find later
📊Excel budgets that drift from reality
📝Notes scattered across three different apps
📧Certs buried in email threads
🤷Guessing what to do next
😰Scrambling before every bank drawdown
With PlotPacer
Evidence attached to the task it belongs to
Budget tracked against every task in real time
One place for everything — on site or at home
Certs uploaded and instantly findable
74-step Irish-compliant sequence tells you exactly what's next
Drawdown readiness checker before you call your solicitor

What PlotPacer does

Built around outcomes,
not just features

Not a generic to-do list. A structured execution system built specifically for Irish self-builds.

📋

Know exactly what to do next

Avoid costly sequencing mistakes.

Built on a 74-step Irish-compliant sequence, from pre-construction to final handover. Every task in the correct order.

🔴

Never accidentally skip a hold point

Stop work that can't be undone.

Critical gates — like engineer sign-off before concrete — are enforced. You can't proceed past a hold point without evidence.

📸

Find any cert or photo in seconds

No more scrambling when the bank calls.

Upload evidence directly to the task it belongs to. When inspectors or banks ask, everything is already organised.

💰

Know where your money is going

Catch budget drift early, not at the end.

Log every expense as it happens. See planned vs actual across all cost categories in real time.

🏦

Be ready for your next drawdown

No more delays in bridging interest.

Know whether you're actually ready before you call your solicitor. BOI and AIB stage models built in.

📱

Log from site, not from your desk

Capture evidence before you forget.

Mark tasks complete and log expenses from your phone on site. Takes 30 seconds — not 30 minutes later.

How it works

Set up in minutes.
Use it for 18 months.

Three things that make the app work from day one — on a live self-build in Co. Westmeath.

1

Import your build schedule

One click loads all 74 tasks in the correct Irish sequence — from site prep to final handover. Edit, add, or remove anything to match your project.

2

Work through it task by task

Each task shows what needs to happen and what evidence to upload. Mark complete when done. The next task unlocks automatically.

3

Know when you're drawdown-ready

Your budget, evidence, and task completion live in one place. When you're ready for a stage payment, everything the bank needs is already organised.

Full drawdown readiness engine with lender-specific rules — coming soon after launch.

Dashboard
Drawdown
Evidence
Stage 2 — Roof Level ⏳ Almost ready
Roof structure completeDone
📸Photo evidence uploadedDone
📋Certifier interim certificatePending
⚖️Solicitor confirmed for drawdownRequired
Stage 2 readiness
75% ready2 items outstanding

Based on publicly available Bank of Ireland self-build mortgage requirements. Always confirm with your solicitor and lender before requesting drawdown.

Evidence attached to: Engineer inspection
📸
foundation_photo.jpg
Uploaded 12 Mar
📋
engineer_cert.pdf
Signed off

Who PlotPacer is for

Built for owner-managed builds.
Not everyone.

PlotPacer is deliberately focused. It's not for large developers or main contractors — it's for the person who is building or renovating their own home and needs to stay on top of it themselves.

✓  Built for
  • Irish self-build homeowners managing their own build
  • People managing a direct-labour build with subcontractors
  • Owner-builders who also have a day job
  • Anyone who needs to stay drawdown-ready
  • Builders managing a small number of projects
✗  Not for
  • Large developers or commercial contractors
  • Projects outside Ireland (Irish regulations built in)
  • People who want generic project management software
  • Anyone who already has a professional PM in place
"

I built PlotPacer while managing my own self-build — because I couldn't find anything that actually worked for how Irish builds run.

Currently being used on a live self-build in Co. Westmeath.

Michael Maloney, founder & self-builder

🔒

Your data stays yours

We don't sell your project data to third parties. We only use your data to operate and improve PlotPacer for your account.

🇮🇪

EU data protection

Operated from Ireland under EU data protection law. You can export or delete your data at any time.

💳

Stripe payments

Billing handled by Stripe. We never store card details. Cancel anytime — no lock-in, no contracts.

Simple pricing

Start free. Pay only when you're ready.

14-day free trial. No credit card required. Cancel anytime.

Solo
€14.99/mo

One active project. Full feature access. Perfect for owner-managed self-builds.

  • 74-task build sequence
  • Hold points + evidence uploads
  • Budget and drawdown tracking
  • Drawdown readiness checker
  • Gantt timeline view
  • File library
Start free trial
Contractor
€29.99/mo

Unlimited active projects. For builders managing multiple self-builds simultaneously.

  • Everything in Solo
  • Unlimited active projects
  • Multi-project dashboard
  • Priority support
Start free trial

Both plans include a 14-day free trial · No credit card required to start

Don't let a missed step
cost you thousands

14-day free trial. No credit card needed. Set up in minutes.

Best started before your build begins — but still valuable if you're already on site.

Get control of your build

Solo plan — €14.99/month after trial. Cancel anytime.